Rama czołowa 74

Front Frame 74

SKU: T1408.074

PLN 131.83gross

PLN 107.18 net

Available delivery options:

Delivery quote

place your order and we'll get back to you with transport cost for approval.

Manufacturer warranty

14-day returns

+48 660 831 010Technical advice, individual quotes and full customer service
+48 570 052 025Order handling, customer support

Technical data

Weight11,60 kg
ModelFRONT 74
Zinc coatinghot-dip
SystemPIN74
SellerIdea Trade S.C.
Unit of measurepcs
Material typesteel
Quantity in packaging20
System height1000 mm
System width739 mm
Overall height1075 mm
Overall width787 mm

Description

The steel front frame 74 is a component of the scaffolding system used to create side protection on the highest level.


Features

  • Functionality: Two vertical posts connected by three horizontal braces.
  • The two upper braces serve as front handrails (main and intermediate).
  • The lower brace prevents accidental lifting of the platform.
  • Equipped with pins with catches for securing the handrails.
  • Compatibility with system handrails and kerbs.

Application

  • Simultaneously serves the function of a section of the front guardrail – has integrated handrails – and enables the installation of the front kerb at the extreme field of Scaffolding.
  • The front frame is a key element ensuring compliance with health and safety regulations concerning work at height, especially in extreme fields of Scaffolding and at the highest levels.
  • Application: Side and front protection of the highest levels of Scaffolding.

Product safety

We ensure all products meet EU Regulation 2023/988 (GPSR) requirements.

Your cart

Your cart is empty